INSTALLATION
INSTALLATION

Vertical Unloading: To be executed by means of a crane and lift chains ( 5-6 meters) which are attached to the lift hooks located on the pod roof angles, after which the pod is lowered and placed in the pre-established position.

Horizontal Unloading: The unloading is done by means of a loading platform placed on each floor of the construction site. The loading platform is used as an initial loading spot, and afterward the pods are moved by means of a mechanical trolley then positioned using hydraulic lift jacks to the exact pre-established position.

After the final positioning has been executed a final control is performed in assuring that the pods are perfectly aligned and leveled. This control check is performed on all bathroom pods and assures that all pods are positioned at the exact height.

Production and Administration Address:
Plg. Ind. La Cruz de Góñar Autovía del Mediterráneo, Salida 559 Aptdo. de Correos 142 04600 | Huércal Overa (Almería)
Head Office:
Pasaje de Austria, Nº 7 Roquetas de Mar (Almería)
Tel. (+34) 950 069 241
Fax (+34) 950 069 242
Certified Quality
© Hydrodiseño S.L. 2010 | Polígono Industrial La Cruz de Góñar | Autovía del Mediterráneo, Salida 559
04600 | Huércal Overa (Almería)SPAIN Tel. (+34) 950 069 241 | Fax (+34) 950 069 242